How to Lay Gravel Grids: A Comprehensive Guide

Use this comprehensive guide to learn how to install gravel grids on any site. It was written by the founder of industry-leading manufacturer IBRAN. The guide draws on over 10 years of experience developing our product and helping over 100,000 gravel grid installation projects during that time.

This guide provides you with ideas on how to lay a plastic grid driveway on virtually any site.

Follow the steps outlined to create the perfect gravel grid driveway:

Step 1 - Measure Up

  1. Take Measurements
  2. Do you need a sub base?

Step 2 - Order the right materials

  1. Order geotextile for above and below sub base.
  2. Calculate and order sub base materials for 150mm depth.
  3. Calculate number of gravel grids by multiplying m2 by 4.
  4. Order edging components and ramps for installation on concrete.

Step 3 - Prepare the sub base

  1. Excavate to a minimum of 210mm depth.
  2. Line the level ground with permeable geotextile.
  3. Fill with 150mm of compacted type 1/2/3 MOT sub base.
  4. Cover with 10mm levelled sharp sand.
  5. Line sharp sand with permeable membrane.

Step 4 - Lay gravel grids

  1. Connecting the grids.
  2. Ensuring stability.

Step 5 - Fill with gravel


Step 1 - Measure Up the Site

Accurate measurements are essential for ordering the right amount of materials.

1.1 Taking Measurements

As with any project, it's important to prepare well. This means taking accurate measurements of the area you hope to fit the gravel grids to. Since it's unlikely that your driveway is perfectly square, it might be better to break down the area into a series of square sections from which you can measure.

  1. Take the length and width of each section to give you the area. Add the sum of these sections together to give you a rough total of the surface area you are laying the grids down on.
  2. Use our calculatorand make sure to round up your measurements to the nearest 0.5m.
  3. It's helpful to add 5% to this total to allow for cuts.
  4. If working in feet and inches, convert your measurements to metric to order the right amount.

1.2 Assessing the Surface

Look at your site carefully. Are you creating a new surface or replacing an existing surface?

Existing surface

If your area already has an existing surface, such as concrete, tarmac, or block paving, consider whether you need to remove that surface or not. If the site is badly broken down, it could be a sign that the sub base beneath is failing or that there are poor drainage issues.

  • Are there large breakages in the concrete?
  • Does the budget allow for a complete removal of the existing surface?
  • How long has the existing surfacing been down?
  • What vehicles do you intend to drive over the site?

If your site has poor drainage and you regularly get floods or pools of water building up, consider how you will get rid of this water. Is a surface water drainage solution needed?

New surfaces

If you're starting from scratch, ensuring your gravel grids last a long time requires you to think carefully about the foundation you give them.

  • Will vehicles be driving over the grids? If so, what kind of vehicles?
  • What kind of soil type do I have? Is it free draining?

When carrying out any surfacing project for motorbikes, cars, vans and trucks, you cannot afford to bypass installing a sub base. It's the foundation that holds up the entire project.

Without a fixed sub base, you're relying on shrinking and expanding soil (particularly clay-based soils) that moves to support something designed to stay still. The grids would slide around between your car tyres and the soil like a bedsheet through a mangle.

If your soil struggles with drainage and gets waterlogged, laying a sub base beneath your grids will aid with the absorption of this water. It creates a permeable layer that allows rainwater to move to the subsoil.


Step 2: Ordering Materials

No project is ready to complete without a list of materials and a schedule of when they're being delivered. Having an idea of delivery dates helps you plan when to start a particular phase of the installation. Having enough materials to complete the project ensures that there are no unnecessary holdups.

Sub base layers for gravel grids

2.2 Ordering the Right Amount

  1. Your sub base should be at least 150mm deep when compacted.
  2. Beneath every good sub base is a permeable geotextile/membrane that allows water to trickle through to the soil below.
  3. Within the grids, you can put any 10-30mm stone you prefer, but 20mm angular gravel is best.
  4. Using stone smaller than 10mm may cause it to get stuck in tyres, while stone larger than 30mm can be difficult to fill.
  5. Calculating how much of these you need for a 150mm deep sub base is very simple, thanks to these useful tools:

Ordering Gravel Grids

The most important step is ensuring you have enough grids to cover the area you've measured completely.

To do this you'll need to calculate how many IBRAN-X gravel grids your site needs. Fortunately this is as simple as multiplying the area you measured earlier by four.

For example, if your site measures 13m x 6m (78m2), you would need 312 grids.


Additional components

In addition to ordering the membrane, sub base and grids, you might want to consider adding a few components to the installation to ensure that the surface is complete, fully functioning and durable for longer.

These are some of the products worth considering:

Gravel Grid Ramp Edging

If you've decided to install the grids over an existing surface, you will need edging ramps to ensure that the entrance is protected and anchored. These ramps should be bolted down using 12mm expansion bolts.


Border Edging

These border edging strips attach directly onto the connectors of the grids, providing a solid division between your gravel surface and adjoining borders and lawns

They can be used to anchor your gravel grid installation on top of an existing surface. They have holes through which you push ground anchors. For installations adjoining grass, the edging strips are packaged with anchor pegs.


Step 3 - Preparing the Sub Base

Now that you have your materials on order and scheduled for delivery, it's time to prepare the site for installation. If you're installing you gravel grids on concrete, you can skip the excavation step of the guide.

Getting your levels right

The key to a good sub base is getting enough material in, compacting it, and ensuring that it is level. Using our sub base calculator our sub base calculator to calculate your total sub base requirements, you have enough type 1, 2, or 3 MOT to create a 150mm deep sub base layer.

During this part of the installation, layer the sub base up 50mm at a time, compacting each layer in turn. It helps to keep the sub base wet and to use a whacker plate/compactor. This wetness helps to bind any fine particles ("fines") in the material, filling in the voids.

3.2 Excavation Depths

  1. Excavate to a minimum depth of 210mm to allow for the sub base, sand, grids, and stone overfill.
  2. To save time and effort, consider hiring a mini-digger.
  3. Grade the surface and line it with a permeable geotextile membrane. This allows water to pass through while preventing the sub base from sinking.
  4. Fill with 150mm of compacted type 1/2/3 MOT sub base, layering it 50mm at a time and compacting each layer.
  5. Cover with 10mm levelled sharp sand, spreading it evenly and compacting it to protect the weed suppressant membrane and prevent sub base movement.
  6. Line the sharp sand with a permeable membrane to minimise weed growth.
  7. Ensure that the sub base layers are compacted and deep enough to be effective, checking your final level with a spirit level.

3.3 Filling in Any Holes

This step applies only to installations on existing concrete or tarmac surfaces.

Most people choose to replace a concrete or tarmac surface because it is extremely broken and unsightly. Installing gravel grids on top of concrete or tarmac is possible, but you should fill in any holes with type 1 MOT and sand.


Now that your surface is ready, you can start to work on laying gravel grids.

Schritt 4: Verlegen der Kiesraster

Dies ist der Schritt, an dem Sie wirklich den Beginn der Transformation sehen. Es ist ein sehr zufriedenstellender Prozess, da sich die Raster schnell miteinander verbinden und eine durchgehende Fläche über der Membran bilden, bereit für Ihren Kies.

4.1 Verbinden der Raster

Richten Sie alle Raster in der gleichen Reihe gleich aus. Halten Sie die männlichen Verbinder unten und auf der rechten Seite der Raster beim Verlegen. Arbeiten Sie nach oben und zurück und verriegeln Sie eine Reihe nach der anderen, indem Sie die weiblichen Verbinder auf die männlichen Verbinder drücken.

Wenn Sie an den Kanten angelangt sind, müssen Sie die Raster möglicherweise zuschneiden, um sie der Form des Installationsbereichs anzupassen. Dies kann mit jeder Säge erfolgen, aber eine Stichsäge ist die bevorzugte Wahl.

4.2 Sicherstellen der Stabilität

Stellen Sie sicher, dass die Kanten gut an den Seiten des Bereichs befestigt sind. Dieser enge Sitz verhindert das Verrutschen der Raster beim Befahren. Wenn Sie ein Kantenprodukt verwenden, ist jetzt der richtige Zeitpunkt dafür.

Überprüfen Sie die Oberflächen und stellen Sie sicher, dass keine verborgenen Unebenheiten vorhanden sind. Die Raster müssen eben auf dem Boden liegen.

Schritt 5: Füllen mit Kies

Die letzte Phase der Installation ist das Füllen der Zellen mit Kies.

Wir empfehlen 20 mm eckigen Kies, aber Sie können sie auch mit allem füllen, was Ihnen optisch gefällt. 10 mm Kies eignet sich gut für Bereiche mit wenig Fahrzeugverkehr. 30 mm Kies funktioniert gut für Bereiche, die für Rollstuhlfahrer konzipiert sind.

Einige Installateure mögen es, den Kies in den Zellen mit der Rüttelplatte zu verdichten, die für die Unterlage verwendet wurde. Dies ist nicht notwendig, unterstützt aber die Verdichtung in den unteren Bereichen der Zellen.

Ihre Kieseinfahrt ist nun nutzungsbereit!

Denken Sie daran, IBRAN-X ist das einzige System, das entwickelt wurde, um Ihnen bei der Installation von Kiesrastern praktisch auf jedem Gelände zu helfen.

Abschließende Überprüfungen und Wartungstipps

  1. Stellen Sie sicher, dass alle Raster eben und fest verbunden sind.
  2. Tragen Sie im Laufe der Zeit zusätzlichen Kies auf, um die Abdeckung zu erhalten.
  3. Überwachen Sie die Entwässerung und ergänzen Sie den Kies nach Bedarf.

Installationsvideo

Video-Installationsanleitung

Unsere Installationsanleitung finden Sie auf YouTube als Schritt-für-Schritt-Anleitung.

Auf YouTube ansehen
Video-Installationsanleitung